internal panel installation process, step one, confirmed the scope of the construction, step two layout, the drawing and recheck the size on working side. step three, claim the dust on panel surface ground and being step four, release the control line in advance and marked the line on floor. step five, transport the panel to the corresponding place, he attention to protect the panel during transport. it reserve the lines, laughter as required in advance. step six for installation, the following tools are needed. 第六个,a handful, a barrow, a crowbar, a mixer, a guiding ruler and especially step seven, installed the accessories you eye to the bin, according to the design handbook, step a with a height of murder called the top panel for large stiffness, concrete structure. skip nine, reserve a tiny millimeter to twenty millimeter gap between panel and top being or floor by using rubber cushion or wooden wage. the gap between framework needs to be reserved as well, stepped in a a c panel bottom, this tightly fixed with wooden wage keeping that does since twenty millimeters. step eleven, put first panel into u i and coat the group with a heat of murder. then install the second panel, squeeze the panel and wrapped them up and down in order to let the east of murder in panel for a bond. it's just the vertical and horizontal flatness. tolerance should be less than three millimeters, and a fixed the connecting excessive then level, the growth gap with growth. modern step twelve, use water to clean up the ground, fill the bottom scene with the one third to met murder or find stone concrete if using anti corrosion wood wage or concrete, which there was no need to remove if using an ordinary wood, which it should be removed after motor concrete. then level the surface with the same material. step thirteen for large danced deal structure or frame structures, use pu farming agent, filling the gap with theme and use p e rod, filling gap of main structure than ground murder to sealed. step fourteen, and i crack gap, top gap and frame gap should set alcoholized standard five mesh first layer crowd murder. the end said, alcohol resistant fiber match, then second layer ground maximized alcohol. i resisted fiber measures, and the effect. step fifteen, if there is a minor, cheap or damage, the panel repair with fixed, step sixteen, clean the panel surface for a better life choose, can you?